Mark Zetter INsight
  • About
  • EMS Industry Documents
Sign in Subscribe

Request-for-Quote (RFQ) Checklist to Uncover EMS Factory Program Costs and Prepare for Contract Negotiations

  • Mark Zetter

Mark Zetter

09 Mar 2025
Share

This document is now available as Checklist for OEM Electronics Program RFQ in Contract Electronics Manufacturing on markzetter.com

Sign up for more like this.

Enter your email
Subscribe
The Duty-to-Dollars Gap

The Duty-to-Dollars Gap

The minute a new duty rate lands you know the questions that matter are not what your supply chain risk dashboard answers. It's eight in the morning at a Tier-1 electronics OEM. Overnight a ten point surcharge stacked on top of the 25 percent Section 301 duties
04 Aug 2026 5 min read

Semiconductor Duty Stacking: Tracking Tariff Exposure When Your Chip Crosses Four Borders

A single integrated circuit can cross four national borders between wafer start and delivery to your dock. Each crossing involves a different manufacturing stage, a different HTS classification, and potentially a different duty rate. For procurement teams managing semiconductor BOMs with hundreds of line items, cumulative tariff exposure across multi-
14 Apr 2026 1 min read
The Manufacturing Conversation Most Hardware Startups Don't Have Early Enough

The Manufacturing Conversation Most Hardware Startups Don't Have Early Enough

Most hardware startup founders treat manufacturing as a milestone. Something that happens after the prototype works, after the pitch deck is polished, after the funding closes. By the time they start emailing factories, they are already behind. The gap is not ambition or technical capability. The gap is preparation. A
07 Apr 2026 3 min read
Mark Zetter INsight © 2026
  • Subscribe
  • Contact
  • Terms of Use
  • Refund Policy
  • Privacy
Powered by Ghost